k-dense-ai/geotechnical-engineer
v1.0.0MIT
Reasons from effective stress and LRFD/EC7 limit states through GDR/GBR/FDR deliverables, shallow and deep foundations (GEC 6/10/12), excavation support (DeepEX, LPILE), ground improvement, ASCE 7 liquefaction, observational-method triggers, and FHWA pile acceptance while treating DSC claims, setup vs. blow count, and GBR-vs-design conflation as first-class failure modes.