Close a sprint with debt review, closeout, QA validation, and retrospective workflows.

agile-sprint-close

Runs the end-of-sprint steps in order: housekeeping, a global engineering and product gate, post-merge QA sign-off, and the retrospective that feeds the next iteration.

Part of agile-skills. Needs gh and the Atlassian MCP (Confluence and Jira).

What you get

Run in this order.

#SkillWhat it doesSay
12agile-12-tech-debt-sweepAudits cross-repo leakage, useless CI, prebuild-image wins, CLAUDE.md / AGENTS.md / SKILL.md cruft, misplaced artifacts, dead code. Report before apply"tech debt sweep", "cleanup sweep", "housekeeping", /tech-debt-sweep
13agile-13-sprint-closeoutMandatory epic-level gate through three lenses; publishes a report"sprint closeout", "close sprint", /sprint-closeout
14agile-14-qa-validationConfirms acceptance criteria hold on main and stamps a sign-off"validate story", "QA story", "QA check", "confirm ACs"
15agile-15-retroRetro page in Confluence, the sprint closed on its Sprint, Iteration and Roadmap pages, Working Agreements and Debt Register rows, refreshed Roadmap Artifact; feeds the next iteration"run retro", "close sprint", "what did we learn"
flowchart LR
  d["agile-sprint-drain<br/>DRAINED"] -. "after the last merge" .-> s["12 tech-debt sweep"] --> c["13 closeout"] --> q["14 QA validation"] --> r["15 retro"]
  r --> n["agile-5-roadmap<br/>next iteration"]

Install

/plugin marketplace add cedricfarinazzo/agile-skills
/plugin install agile-sprint-close@agile-skills
/reload-plugins

On Codex, run codex plugin add agile-sprint-close@agile-skills and invoke $<skill-name>. Closeout phases and review lenses run sequentially inline, without subagents. Artifact publication is optional; Confluence stays the complete result. See the compatibility guide.

Closeout: the third review layer

agile-13-sprint-closeout is a global, impartial gate on an epic's wired-together delivery against its goal (input: an epic key). The per-PR reviews (author self-review and independent merge review) already happened. Three lenses:

LensQuestion
EngineerDoes the system work on a freshly rebuilt dev stack? (smoke and integration)
Architect / PMDoes delivered code match the documented intent (Vision, PRD, ADR, Roadmap, epic ACs)?
Tech LeadDoes it hold up under an impartial deep review of all sprint diffs?

A single Critical from any lens blocks closeout. The report goes to the Closeouts container (a Confluence page or folder) in a fixed nine-section layout (a phase not run is marked NOT RUN, never omitted), is read back to check its parent and rendering, and the retro reads it. It catches a sprint whose ACs pass individually but whose wired system fails. Phase 6.5 audits the merge train's Jira links with a bundled stdlib script (skills/agile-13-sprint-closeout/scripts/audit_merge_train_links.py; tests beside it, python3 -m pytest that dir).

QA: confirm after merge

By the time agile-14-qa-validation runs, the Story is already Done; the merge train owns that transition. QA confirms the ACs hold on main and stamps a sign-off comment. It never transitions the Story. A pass adds the qa-approved label and the sign-off comment. A post-merge regression is filed as a new Bug (linked is caused by, Story labelled qa-regression), never a reopen, because reversing Done would lose the merge audit trail.

Retro and next iteration

agile-15-retro first answers every open question left in the sprint's Jira comments (from evidence, or with you through a question with options) and replies on each ticket. After the interview it puts each action item to you as a question with options (keep, turn into a ticket, merge, drop). It then writes the retro page in Retrospectives, reads the closeout report, closes the sprint's Sprint N page (properties, outcomes, conclusion) and its rows in the Iteration page and the Roadmap rollup (the Iterations table status flips only on the iteration's last sprint), adds standing rules to the Working Agreements and debt to the Debt Register, closes the sprint in Jira (carried-over Stories return to To Do; Won't Do Stories are confirmed with you), and hands velocity, feedback, debt and actions to agile-5-roadmap (ITERATION mode).

Retrospectives and Closeouts are sibling containers (each a page or a Confluence folder) directly under the project root, never nested. See the canonical folder tree.

Where it fits

After agile-merge-review (or agile-sprint-drain reaching DRAINED); loops back to agile-planning. Full cycle: root README.