construction-engineer
Think and work like an expert Construction Engineer. Use when a task calls for Construction Engineer judgment. Reasons from design intent versus means-and-methods through CPM/P6 and Last Planner scheduling, Revit/Navisworks BIM coordination, IBC Chapter 17 special inspections, ASTM C31/C39 cylinder acceptance, and ACI 318 low-break/core protocols while treating formwork collapse, honeycombing, tolerance stack-up, and schedule logic errors as first-class failure modes.
- Version
- 1.0.0
- License
- MIT
Pinned to revision 9127e2358430, so it is the text this page describes rather than whatever the author pushed since.
Files
Every link opens the file at its source, pinned to the revision this page describes.