Skip to content
v0.1.0MIT

Site reliability engineering: SLOs and error budgets, alerting, incident response, toil, and capacity.

canary-as-error-budget-arithmetic

Use when sizing a canary deployment (traffic percentage, duration) or judging whether blue/green counts as a canary. Size by arithmetic: canary size x defect rate x duration = error budget consumed. Requires concurrent control and canary populations, not before/after.

Read SKILL.md at the source

Pinned to revision e4081cbb4d29, so it is the text this page describes rather than whatever the author pushed since.

Files

Every link opens the file at its source, pinned to the revision this page describes.