Skip to content
v0.1.0MIT

Site reliability engineering: SLOs and error budgets, alerting, incident response, toil, and capacity.

10x9-cost-reliability

Use when someone sets, demands, or challenges an SLO target ("we need five nines", 99.999%) without stating its cost. Frames each extra nine as roughly 10x more reliability for roughly 10x more cost, to justify or push back on 3-nines vs 4-nines vs 5-nines mandates.

Read SKILL.md at the source

Pinned to revision e4081cbb4d29, so it is the text this page describes rather than whatever the author pushed since.

Files

Every link opens the file at its source, pinned to the revision this page describes.