reach-plan-audit
Use right after every reach plan save, and whenever reach qualify stops at plan_audit. A second, independent pass that checks the saved plan against the assignment's released constraints before any code is written or qualified.
Pinned to revision 5494fa1d2b43, so it is the text this page describes rather than whatever the author pushed since.
Files
Every link opens the file at its source, pinned to the revision this page describes.