data-migration
Hard gate before any database schema change or data transformation in production. Requires a written migration plan with rollback strategy, dry run, and verification steps before execution. Prevents data loss, downtime, and irreversible schema changes.
Pinned to revision d728e459b725, so it is the text this page describes rather than whatever the author pushed since.
Files
Every link opens the file at its source, pinned to the revision this page describes.