Skip to content

rbraga01/a-team

v1.4.1MIT

A complete engineering team in one folder: 26 specialist agents, 20 skills, orchestrated workflows and quality gates.

data-migration

Hard gate before any database schema change or data transformation in production. Requires a written migration plan with rollback strategy, dry run, and verification steps before execution. Prevents data loss, downtime, and irreversible schema changes.

Read SKILL.md at the source

Pinned to revision d728e459b725, so it is the text this page describes rather than whatever the author pushed since.

Files

Every link opens the file at its source, pinned to the revision this page describes.