Skip to content

panqiwei/pqw-skills

v0.24.1MIT

A development flow for large changes: define with the human, hand off one run at a time, let the agent deliver in slices, then verify. 25 skills plus six thinking models.

spec-and-plan

交付期第 7 步,plan;另管交接期定约时写的 spec:spec 在定约时和人一起写,定目标、边界与可核对的验收标准;plan 在交付期开头写,把这一程切成有序切片;自带两份模板,项目有模板以项目为准。定约时、交付会话从交接信息包开工时,或人说「写 spec」「出计划」「切片」时加载,也可点名 /spec-and-plan。定义期没走完不加载;分不分程归 pass-the-baton,开工前的上下文包归 context-pack。

Read SKILL.md at the source

Pinned to revision 95def4043198, so it is the text this page describes rather than whatever the author pushed since.

Files

Every link opens the file at its source, pinned to the revision this page describes.