retire-plan
Check a backlog plan or spec against what is actually built and act — retire a fully built plan, re-scope a partly built one, or leave it and say why. Use to ask whether a plan is done, or to retire a plan.
Pinned to revision 58952761cd5b, so it is the text this page describes rather than whatever the author pushed since.
Files
Every link opens the file at its source, pinned to the revision this page describes.