run-retrospective
Post-spec retrospective that captures lessons learned, fixes documentation drift, and proposes skill improvements. Reads the Linear spec, story sub-issues with comments, and the Validation Report. Writes retrospective to the knowledge base on disk and posts a back-link comment on the spec issue.
Pinned to revision 7de911f87b8d, so it is the text this page describes rather than whatever the author pushed since.
Files
Every link opens the file at its source, pinned to the revision this page describes.