Skip to content

manhnc-dev/jstack

v0.1.0MIT

Requirement and design in, reviewable implementation plan, sub-500-line PR plan, and verified PRs out. Agent teams with evidence.

jstack-verify

Independently verify one implemented PR with three fresh workers. The gates lane runs base and head suites, measures size, checks plan conformance, captures evidence, writes report.md, rerun.sh and artifacts under docs/jstack/<slug>/verification/<PR-n>/; two audit lanes read the diff against the plan; the coordinator folds their findings into the report and the bundle checker gates the result.

Read SKILL.md at the source

Pinned to revision 3c577e2829c8, so it is the text this page describes rather than whatever the author pushed since.

Files

Every link opens the file at its source, pinned to the revision this page describes.