Skip to content

kvasanova/loomwork

v0.5.0

SDD lifecycle for superpowers: status-frontmatter convention, drift audit, pre-merge close-out, and a close-out hook gate. One loom, one status surface.

close-out

Use during finishing-a-development-branch (after tests pass, before integration) when the work was tracked by a plan or spec in the SDD docs dirs. Commit and push close-out to the feature branch — same PR, no post-merge follow-up.

Read SKILL.md at the source

Pinned to revision 9e6b030e81c3, so it is the text this page describes rather than whatever the author pushed since.

Files

Every link opens the file at its source, pinned to the revision this page describes.