Skip to content

kvasanova/loomwork

v0.5.0

SDD lifecycle for superpowers: status-frontmatter convention, drift audit, pre-merge close-out, and a close-out hook gate. One loom, one status surface.

audit

Run the SDD drift linter — flags stale spec status, missing plan DONE banners, and missing/stale verified dates. Use monthly, before large SDD meta-work, or when spec/plan status looks wrong.

Read SKILL.md at the source

Pinned to revision 9e6b030e81c3, so it is the text this page describes rather than whatever the author pushed since.

Files

Every link opens the file at its source, pinned to the revision this page describes.