Skip to content

kvasanova/loomwork

v0.4.2

SDD lifecycle glue for superpowers + compound-engineering: status-frontmatter convention, drift audit, pre-merge close-out, and strategy/close-out hook gates. One loom, one status surface.

audit

Run the SDD drift linter — flags stale spec status, missing plan DONE banners, and missing/stale verified dates. Use monthly, before large SDD meta-work, or when spec/plan status looks wrong.

Read SKILL.md at the source

Pinned to revision 628f00c59f19, so it is the text this page describes rather than whatever the author pushed since.

Files

Every link opens the file at its source, pinned to the revision this page describes.