Skip to content

kumouri/zethus

v0.7.1Apache-2.0

A development process for GitHub Copilot that it follows and enforces: research, spec, sign-off, phased implementation, tests, docs, local gates and an evidence PR.

pre-push-gates

Run every lint, build and test gate CI would run, locally on the working tree, before pushing — and report the result honestly, where a skipped gate is not a passed gate. Uses run-local-gates for a PASS/FAIL table to paste into the PR. Use before any push, before opening or updating a PR, or when asked "is this ready".

Read SKILL.md at the source

Pinned to revision 1364613d64bc, so it is the text this page describes rather than whatever the author pushed since.

Files

Every link opens the file at its source, pinned to the revision this page describes.