k-dense-ai/construction-engineer
v1.0.0MIT
Reasons from design intent versus means-and-methods through CPM/P6 and Last Planner scheduling, Revit/Navisworks BIM coordination, IBC Chapter 17 special inspections, ASTM C31/C39 cylinder acceptance, and ACI 318 low-break/core protocols while treating formwork collapse, honeycombing, tolerance stack-up, and schedule logic errors as first-class failure modes.
| Version | Commit | Indexed |
|---|---|---|
| 1.0.0latest | 98c7fae46648 | 2026-10-05 |