build-parallelism
Analyze an MSBuild solution, solution filter, or Build.proj that schedules multiple project files. USE FOR: measured idle worker nodes, -m that does not scale, a serial ProjectReference critical path, graph builds, or an MSBuild task that builds a Projects list. Requires at least two distinct project files whose scheduling or throughput must be analyzed. DO NOT USE for non-MSBuild build systems.
- License
- MIT
Pinned to revision 6a2c2b5ae7da, so it is the text this page describes rather than whatever the author pushed since.
Files
Every link opens the file at its source, pinned to the revision this page describes.