spec-driven-development
Creates specs before coding. Use when starting a new project, feature, or significant change and no specification exists yet. Use when drafting a PRD or requirements document with objectives and scope, or when requirements are unclear, ambiguous, or only exist as a vague idea. Use when a single requirement spans several independently testable capabilities and needs decomposing into a capability map of modules before specifying. Use when evolving a shipped spec — scoping a V1, deferring ideas to a V2 backlog, or writing a follow-up spec for a change to an existing feature.
Pinned to revision d1d43c80ae04, so it is the text this page describes rather than whatever the author pushed since.
Files
Every link opens the file at its source, pinned to the revision this page describes.