Skip to content

archelps/arc-engineering

v0.1.0

100 AI skills for systems and hardware engineers: requirements review, electrical and mechanical interfaces, power and mass budgets, environmental qualification, FMEA and verification. Includes local MCP file tools.

review-risk-register-statements

Find missing technical risks and rewrite vague entries as cause-event-consequence statements.

Read SKILL.md at the source

Pinned to revision 279b09e0b2ae, so it is the text this page describes rather than whatever the author pushed since.

Files

Every link opens the file at its source, pinned to the revision this page describes.